Radio Road Construction

August 16, 2021

A major part of the work at Radio Road in the early months was the cleaning out of the materials left there and the removal of structures that would not be used. There were two bathrooms, women's and men's, and they would not be kept as constructed for their previous use.

These bathrooms were basically institutional standard plain bathrooms.

The stalls and basic industrial fittings were removed to clean the areas of the two bathrooms to make preparation for future plans.

During the same time period, Jeff was working with Brandon Moore to lower the high metal antenna towers. Jeff had the plan to try to use them for the framing structure of his planned front porch. Brandon is putting on his climbing harness to climb one of the big towers to tie it off in preparation for bringing it down.



Wall framing in large room at Radio Road
Index

2021
  Nave Album Go Back