Len and Sherry went up with us on the weekend of December 2 to work on the stairs. This is Len with all of us at suppertime on December 4.
Jeff and Mark help Rod drill the steps for the stair between the main floor and attic level.
Rod and Len drill holes in the 4" cedar stair stringer for the stair on the floor above.
Rod bolting on the steel tread supporters for the open stair. The steps were bolted into the stringers and then also supported by steel angle pieces that we had cut and drilled.