Mt. Redoubt Baptist Church Construction
Friday, August 23, 1991
 | Having run decking to the back of the building on one side, Jeff and Warren worked on assembling the upper wall for that side. |
Harry, Dick Weaver, and Rod worked on the deck. Gene was kept extremely busy with checking, planning, and materials procurement. |  |
 | The weather held and we put in another full day, finishing the back stairwell and all the floor joists and all but a couple of sheets of decking. |
Jeff placing some of the final floor joists. |  |
 | Dick Weaver and Harry Espy finishing up floor joists around the rear stairwell. We worked until about 10pm. |
|