Mark Builds Metal Arch for Strand Theater

January , 2009

Mark built a steel fram about 24' by 20' high for the stage at the Strand Theater in Marietta. He had to bend the steel to the pattern and then weld and finish. The patterns within the portal were cut out with a C&C router.

This is the third project he has done for the Theater, starting with the Dropping Rose for the "Beauty and the Beast" production before Christmas.

Georgia Tech BSU alumni gathering.
Index

2009
  Nave Album Go Back