The beginning of the main roof replacement, Radio Road
April 27, 2022
After the preparation of the front porch roof, the main roofing was undertaken.
| The old shingles have been removed from the back part of the house in preparation for putting on new shingles. |
The sealing undercoat layer has been completed on the back side of the house. That's a lot of shingles stacked by the building! |
|
| The roof appears to be prepared for the adding of the shingles. The roof turrets have been removed in favor of peak vents as is common current practice. |
April 30
This was certainly something to celebrate. The custom-designed and built porch on the front of the house with a new roof that connects smoothly to the roof of the main house.
It is a pleasure to see both the main house with porch and the shed with brand new shingle roofs. |
|
|